Dates Processing and Sorting Line

Description

The line is designed for capacities of 1,500–2,500 kg/hour and consists of the following stages:

  1. Conveying System: Smooth transport of dates to processing stages.
  2. Vibration Units: Remove debris and prepare for sorting.
  3. Manual Sorting: Operators remove defective dates.
  4. Heating & Drying: Controlled chambers reduce moisture to desired levels.
  5. Packaging: Dates are weighed, sealed, and packed efficiently.

The system is energy-efficient, modular, and complies with international food safety standards. Suitable for medium to large-scale operations.